- Problems
- A company put in a new mixing tank where required operators to move the hopper from the ground to a height of 1.7 meters. A crane was also impractical, since the ceiling was only 2.8 meters high.
- Solutions
- Raku-Raku Hand made the job easy for one person to complete the transfer.
- Job facts
-
Load Powder-filled hopper (70 g) End Effector Forked end effector Product Pneumatic Raku-Raku Hand CR100 Installation Method Pedestal